With a red-hot market for business aircraft, Gulfstream plans two-front assault and bombardment on French and Canadian rivals.
JoinedMay 31, 2018
Articles399
Comments1
Jon Ostrower is Editor-in-chief of The Air Current, where he leads coverage of the global aerospace and aviation industries. Prior to launching TAC in June 2018, Mr. Ostrower served as Aviation Editor for CNN Worldwide, guiding the network’s global coverage of the business and operations of aviation. Mr. Ostrower joined CNN in 2016 following four and a half years at the Wall Street Journal. Based first in Chicago and then in Washington, D.C., he covered Boeing, aviation safety, and the business of global aerospace.
Before that, Mr. Ostrower was editor of FlightBlogger for Flightglobal and Flight International Magazine covering the development of the Boeing 787 Dreamliner and other new aircraft programs from 2007 to 2012.
He is also an instructor at the University of Southern California in the Viterbi School of Engineering's Aviation Safety and Security program. Mr. Ostrower, a Boston native, graduated from The George Washington University’s School of Media and Public Affairs with a bachelor’s degree in Political Communication. He is based in Seattle.
The Air Current has focused recent months extensively reporting on Airbus’s, until now, secret research effort to completely re-wing a Cessna business jet and rapidly accelerate a suite of new advanced flight control technologies -- including a foldable wingtip designed to flap freely in turbulence and maneuvers.
While Boeing announced it would slow the rate at which it builds 787s in mid-July below five per month, some suppliers have halted work and deliveries of large structural sections by at least one major supplier won’t restart until at least October 26.
With this evaluation for its turboprop concept, Embraer is scratching at an entirely new strategic consideration for a multi-decade aircraft program. While large aircraft design has relied on the same fundamental type of fuel, coupled with successive generations of ever-improving engines, Embraer views its new 90-seater airframe as propulsion agnostic and a halfway step toward hydrogen. Positioning the engines on the rear of the aircraft might not produce the single most optimized design in 2027, but, in Embraer’s view, that deliberate non-optimization allows room for future evolution and growth.
As COVID-19 mutates to continue its torment, aviation adapts right along with it.
Fundamentally, even with this new shape, Embraer’s tentatively designated TPNG 70 and TPNG 90 (Turboprop Next Generation) haven’t changed in their overall mission. The aircraft is still a 70 to 90-seat turboprop with a range “a little bit more than 800 nautical miles” but optimized for flights between 250 and 300 nautical miles and flown at speeds “faster than an ATR, but not as fast as the Dash 8-400,” said Souza, putting its cruising speed between 300 and 360 knots. Embraer’s goal is a 15% to 20% improvement in cash operating costs for its bigger TPNG 90 compared to the ATR 72-600.
Afghanistan is lost. Beyond the crushing enormity of the human tragedy unfolding there, the jarring images from Kabul Airport capture not only the desperation to escape the Taliban, but the very essence of what aviation represents as a path to the future. Embraer heavily revised its turboprop concept and with it the company is shifting its focus from Asia squarely to North America. Qatar Airways has pulled 13 A350s from service on the order of its home regulator, but what's paint issue facing the aircraft?
Challenges from logistical to geopolitical permeate every level of the Boeing’s 737 Max visit to China. ATR's struggle to certify its own turboprop is a template for Boeing's uncertainty.
Airbus has launched its A350 freighter and the move is kicking off an arms race with Boeing, which has enjoyed a near-monopoly in the segment for decades. What if you could swap a battery between flights on an electric airplane? Tecnam thinks they may have the solution to speed up turn times for its P-VOLT commuter. Globetrotting ferry pilots document life in the air and what it's like flying through a pandemic when business is booming. Cockpit Casual is finally here and its worth every moment of your time.
Dogged by languid demand for twin-aisle aircraft and a spate of inspections, rework and manufacturing quality issues on already-built 787s, a question of the program’s long-term profitability hangs over Boeing. In its decade of deliveries, Boeing has earned back about half of the more than $28 billion in 787 production costs it has consistently reassured Wall Street it will recover.
With a method called program accounting, long blessed by both the U.S. Securities and Exchange Commission and its auditor, Deloitte, Boeing spreads its high early costs of jetliner production over a roughly 10-year block of deliveries, enabling it to book future earnings in times of steep cash usage. Ultimately the intent is to balance out the enormous costs of producing a jetliner and recognize the long-term rewards of a successful program.
Even as Boeing works to explain its detailed statistical analysis to the Federal Aviation Administration of its inspection findings on its fleet of undelivered 787 Dreamliners, the company continues to disclose new issues with its aircraft that further disrupt its path toward resetting its production system and restarting deliveries.